Pulp and paper’s next AI gain may come from a production plan that can adapt

PulpandPaper

A production schedule can look right at the start of a shift and become obsolete when a supplier misses a delivery, a machine stops or an order changes. In pulp and paper, these events quickly affect setup time, capacity and delivery commitments.

That is why I believe one of the most valuable applications of AI in the sector is also one of the least theatrical: helping planners rebuild a feasible production plan when operating conditions change.

A recent LTPlabs project offers a practical example. At one mill, production planning covered several machines, product grades, customer orders and due dates. Planners had to decide what to produce, where to run it and how to group orders, often by manually rebuilding the sequence. Each change of grade or production sequence could add setup time, reduce available production time and put delivery dates at risk.

The solution combined mathematical optimisation with the producer’s own planning rules. It matched orders to intermediate stock, allocated production across paper machines and converting lines, and proposed sequences that accounted for setup rules, capacity, maintenance periods and due dates. Planners could adjust parameters, compare key measures and review the recommendation before releasing a plan.

The early results are encouraging, with an important qualification. Across four planning weeks at one mill, preliminary validation showed 27% lower setup time per tonne in cutsize planning and 38% lower setup time per tonne in folio planning, compared with actual planning. After model refinements, the effective production rate in cutsize increased by 0.6 percentage points. The project was still in final validation, and the impact was due to be confirmed after rollout.

The figures matter, but so does the way the work was designed. The application did not take the decision away from planners. It gave them a feasible starting point, made trade-offs easier to compare and left the final plan in their hands. That is a useful standard for AI in process manufacturing: recommendations should fit the constraints people manage and make their decisions easier to review.

Start with the decision, then choose the technology

The same principle applies beyond production scheduling. Pulp and paper leaders face connected choices about demand, pricing, fibre, energy, inventory, maintenance and service. A demand forecast affects the production plan. The production plan affects stock, energy use and delivery promises. A maintenance window changes available capacity. Treating each question as a separate analytics project can miss how one decision affects the next.

This does not mean every company needs one large AI programme. Each use case should begin with a specific decision, such as how to sequence orders across lines while accounting for operational constraints. Teams can then decide what data, models and workflow support that decision, and how they will measure the result.

In planning, a model is useful when it can compare feasible alternatives quickly enough for people to act. It must also show the operational consequences of each option. A schedule that minimises setups while missing due dates is not a good schedule. A plan that looks efficient on screen but cannot be executed on the shop floor will not be adopted.

The next productivity gain

AI in pulp and paper will be judged in the daily decisions that protect throughput, service and margin. For production planning, a good test is simple: when an order, machine or material constraint changes, can the team see a workable alternative sooner, understand its consequences and decide whether to use it?

With one costly decision, one real operating constraint and a pilot whose results can be checked against the way the work is done today.